This is not your father’s pre-engineered metal building. Today, with the quality of building materials available, it makes sense to use a pre-engeered metal building as the heart of your next project. They are constructed from green-friendly materials that will last a life time. You get consistent quality & finishes, something you can’t say about wood these days. They are very durable. Wind loads are transferred to your foundation more efficiently, and connections at critical points are much stronger, making this a much safer building method. Last, but certainly not least. The economics of a pre-engineered metal building makes a new building much more affordable that you think.
Pre-engineered Metal Buildings Make Sense
August 24, 2009Design-Build Process
August 8, 2009The designing of the building goes thru various levels of process until we get to construction or a buildable set of documents. The levels are concept, schematic, design development and construction. The earlier documents in design build would include different portions of the project at different levels of completion. Concept level goes to schematic level, the schematic design development structural drawings then go to their concept level. The mechanical, electrical, plumbing and sprinkler drawings are often put together by competent design builder subcontractors, selected by the design builder. In this case, for many projects, the cost of mechanical and electrical engineering can be completely eliminated.
In summary, the Design Build Construction Method provides:
· Total responsibility for design construction and satisfactory completion of the project.
· Solutions tailored to the owner’s problems and concepts that meet the owner’s goals.
· Price testing of concepts before design changes becomes very expensive.
· Guaranteed maximum price early in the process, which assures the owner will get the building he wants as defined at the agreed price.
· Use of the fast track method which allows the project to be completed more quickly.
· Close association and coordination with all the parties involved and the quicker response to design construction problems.